29 SEP 2021
Stair flooring installation just started at Building 4. At Building 3 is the sensor installation, which will play an important role in the HOMMA Haus experience!
27 SEP 2021
Has the rainy season begun? Roof had been installed at Building 2.
You can see the inside courtyard view from different angles.
27 SEP 2021
At Building 3, the refrigerator has been installed in the kitchen and the master bathroom interior finishes continues. Last picture shows the entrance area from the living room.
27 SEP 2021
At the stairs of Building 4, the channel for the LED strip light has been installed, making you wonder how the HOMMA lighting experience will be. Also the gas stove in the kitchen is installed.
27 SEP 2021
At Building 6, the elevator hall now has a window which makes the space feel airy and spacious.
*The elevator takes you to the basement bicycle parking area.
16 SEP 2021
Weekly meeting with our general contractor team, our local architect, and HOMMA team. Organizing all the small to big details. Solving all the obstacles.
16 SEP 2021
At Building 3, the vanity mirror with lighting and the counter light fixtures has been hung, and the kitchen ventilation is being installed. Moving to Building 4, you can see the installed ventilation. This kitchen has a dishwasher and a microwave, waiting for the gas stove to arrive. One of the 2nd floor bathrooms has the vanity installed.
16 SEP 2021
At Building 6, you can see the retainer wall in front of the building, which also will play a role as a planter that adds more greenery to the project.
10 SEP 2021
Our cedar soffit in natural stain is chosen to enjoy the contrast with the dark cedar accent wall as well as to give you a natural feel. You can definitely start seeing all the moderness of the exterior at Building 3. Building 4 follows by installing the upper exterior accent wall.
10 SEP 2021
Building 3 interior has been rapidly changing.
Downlights, shoe storage, and stair handrail has been installed.
10 SEP 2021
2nd floor wall framing continues at Building 2, which now hides the inner courtyard to give privacy to the future residents. Building 1 is in the process of painting, and drywall installation for Building 6.